Digital Interlockings

Relay and electromechanical interlockings are being replaced across Europe, and the replacement is (mostly) a software product. Project effort moves with it: from cabling and civil works to development, testing and approval - all three of which can be industrialised.

Architecture diagram of a digital EULYNX interlocking and its standardised interfaces to field elements and control systems

This is the interlocking itself: how it is developed, how it is tested, and how it is commanded. The standardised interfaces it speaks are covered under EULYNX, the engineering data behind its configuration under Engineering Automation, and the platforms it runs on under COTS and Cloud Platforms.

What is being replaced, and how fast

Interlockings installed decades ago are reaching the end of their supportable life, and the replacement is a programme rather than a project. DB InfraGO alone counts some 4,000 interlockings in Germany, half of them from before the computer era, and has set itself the target of renewing 200 of them by the end of 2026. SBB is replacing around 80 per cent of its roughly 500 installations over the next twenty years, at about CHF 1.4 billion, with the first in service from 2029. What replaces them is a system whose logic is software and whose field connections are standardised interfaces: less cabling, less civil work, and central management of installations that were previously local.

The effort does not disappear, it moves. Wiring and civil works give way to software development, interface implementation, cybersecurity (RED, NIS2, CRA, ...) and the test evidence needed for approval - and to the question of how much of that can be repeated for the next station rather than redone.

How far that industrialisation can go depends on the interfaces. Where the interlocking reaches ETCS, neighbouring interlockings, field elements and control systems or even its own computation platform (see COTS and Cloud Platforms) over standardised interfaces, the parts can be procured separately, tested independently and replaced on their own lifecycles rather than the system's. Configuration and data management become a key concern in ever more complex and large-scale deployments.

Where interlocking projects can make a difference

As standards mature and respective tenders for Digital Interlockings are issued, we lay the foundation of tomorrow's engineering lifecycle. These areas determine how quickly a station moves from plan to operation and what happens during the ~30 years after.

“When you invent the ship, you also invent the shipwreck”
— Paul Virilio
Development with foresight
Design and Development

Development with foresight

Digital Interlockings depend on technology which has significantly shorter lifecycles than the interlocking itself. Whilst tenders require 25, 30 or even more years of continued support, the underlying technology may need to be updated multiple times within that period. Hardware and (especially security-related) software components need regular updates. Operational demands change, tracks are added or removed, neighbouring interlocking areas upgraded, regulations changed. How well an interlocking can be modified, extended and maintained while keeping the effort for safety recertification low is crucial for TCO. Development practices such as MBSE and formal verification using model checking and theorem proving can create higher certainty on correctness and simplify, if not automate, validation of safety logic. Modular design of technology and safety case can make replacement easier. Railway operational COTS platforms separate application software (generic and specific application) from the dependability of the execution platform (the generic product) itself.

  • Design and development support throughout all CENELEC phases
  • Expertise in railway standards as well as operating systems and middleware
  • Engineering process tailored to early and robust verification
Object controllers and the equipment behind them
Field elements

Object controllers and the equipment behind them

Points', signals' and level crossings' sensors and actuators are interpreted, controlled and translated to digital protocols for the interlocking through object controllers. Whether they control a single field element or a large array of devices, each system requires a safety assessment and each connection is a specified interface with its own conformance and behaviour to demonstrate. Getting that layer right is what allows equipment to be procured and replaced on its own lifecycle instead of the interlocking's. Due to the large number and geographical distribution of object controllers, finding approaches to effective RAMS management and in turn a highly reliable system is essential.

  • Object controller interface testing
  • Field element behaviour reproduced for test purposes
  • Software development for EULYNX and NeuPro interfaces
Test Environments for all Stages
Testing

Test Environments for all Stages

Static and dynamic verification are not just key to building evidence for the safety case, they are also fundamental practices of system design and software development. An engineering process that relentlessly optimises feedback cycles and feedback quality yields predictably better results, reduces cost in the mid to long term and simplifies downstream processes. Tests begin at the earliest stages of modelling and development and continue throughout the lifecycle.

  • Model-, Software- and Hardware-in-the-Loop environments
  • Simulated field elements and control systems
  • Regression tests repeated on every configuration change
Operating the interlocking over a standardised interface
Command and control

Operating the interlocking over a standardised interface

An interlocking is commanded and supervised over a standardised interface. A conformant control system on the other end of that interface makes the interlocking workable on the bench: it can be shown to stakeholders, driven through irregular and degraded situations on demand, and exercised by automated tests.

  • System demonstrations without spending millions on the control centre product
  • Feedback to developers while the interlocking is still being built
  • End-to-end test automation in headless mode
  • Continuous integration and delivery and automated regression testing
  • CENELEC-aware AI assistance for test generation and analysis

Services

What we deliver on these projects, for infrastructure managers and for suppliers.

Development and Integration Support

Development and Integration Support

Engineering support for interlocking and object controller development, across the specified interfaces and integration with other subsystems including execution platform.

Book a free consultation
Test Environments

Test Environments

MiL, SiL and HiL setups with simulated field elements and control systems.

Discover Platform21
Command and Control

Command and Control

A conformant SCI-CC control system for development, test and demonstration.

Discover Scirocco
CENELEC-aware AI Assistance

CENELEC-aware AI Assistance

AI applications that help with incongruency in specifications, defect discovery and quality assurance, generate and analyse tests on top of a CENELEC-conformant base process.

See how we work
Requirements Management

Requirements Management

Specification work from operational context through system requirements specification to implementation. Requirements formalisation using formal methods.

Tool-Assisted Configuration

Tool-Assisted Configuration

Interlocking configuration tooling to turn planning data into executable interlocking configurations including operational data, technical configuration and networking.